RPB Physical Protection – HDPE Mat Installation

As part of ongoing pipeline integrity risk assessment, the Roma to Brisbane Pipeline (RBP) and the Peat Lateral System need to be provided with additional physical protection to mitigate any risk against mechanical damage from excavation and vertical drilling / augering equipment.

Location: Scotia Station to Brisbane

End User: APA Group

Completion Date: April 2020

Scope of Works:  
Installation of approx. 1km of HDPE matting at 5 different sites along the Scotia Lateral, Peat Lateral, and RBP Pipelines

Project highlights:  
This project involved a broad range of geographical sites and therefore presented some logistical challenges to overcome.

Sites ranged from live Gas facilities, to open paddocks, to busy urban intersections – all of which presented different obstacles to overcome.

This scope of work was completed incident free and ahead of schedule for our Client APA Group.