Our Projects
We bring creativity and imagination together to
deliver cost effective, smart, innovative solutions across all aspects of our business.
Auspost Warehouse Redbank
Spaceframe commenced construction of the largest parcel facility and delivery centre in the southern hemisphere in August 2018. The site is 160,000 sqm, which includes a huge 48,677 sqm warehouse, 1,600 sqm office space and a further 100,000 sqm of hardstand.
RPB Physical Protection – HDPE Mat Installation
As part of ongoing pipeline integrity risk assessment, the Roma to Brisbane Pipeline (RBP) and the Peat Lateral System need to be provided with additional physical
protection to mitigate any risk against mechanical damage from excavation and vertical drilling / augering equipment.
APA Roma to Brisbane Complex Digs
APA are Australia’s leading energy infrastructure business. The Roma to Brisbane Pipeline is a transmission high pressure gas pipeline that transports natural gas between the Wallumbilla gas hub and Brisbane. The Pipeline is 438km long and is a critical asset for the transfer of natural gas to Brisbane and various other regional areas
PBE062 – Reservoir Renewal Program Mechanical and Civil Package
HH Civil were contracted by Downer Utilities to complete civil and mechanical repairs and upgrades to five reservoir complexes in South East Queensland. This included structural steel and metal works, concrete road and footpath construction, pipework installation, general civil works and reinstatement.
LS305 – Greenbank to SPS151 Trunk main
The project involves launch and retrieval excavations upto 6m Deep, laser guided trenchless installation, manhole installation, and commissioning works.
Regional Treatment Plant CWP – Laidley STP: Mechanical Structural and Civil Works
John Holland Pty Ltd have been engaged by Queensland Urban Utilities to undertake the design and construction of multiple Sewage Treatment Plant upgrades.
HH Civil were awarded the civil, mechanical and structural work package by John Holland for Laidley STP upgrade